Improvements
Antony
Posted on November 8, 2022
Hi, I'm following the growth of your product, getting better and better.
Here are my suggestions.
- Allocate cost per accessory.
- Allocate the operating cost per cut footage.
- Allocate operating cost per tape footage.
Some functions you can get inspiration from software like MaxCut, CorteCerto, Promob.
Your product has great capacity in Brazil, making some adjustments, you can reach from small carpenters to large industries.
Here are my suggestions.
- Allocate cost per accessory.
- Allocate the operating cost per cut footage.
- Allocate operating cost per tape footage.
Some functions you can get inspiration from software like MaxCut, CorteCerto, Promob.
Your product has great capacity in Brazil, making some adjustments, you can reach from small carpenters to large industries.
Boris Beaulant
Posted on November 8, 2022
Hi Antony,
Thank you to appreciate OpenCutList !
Thank you to appreciate OpenCutList !
Allocate cost per accessory.
Allocate the operating cost per cut footage.
Yes but a generic price per length of a different price according to the material ?
Allocate operating cost per tape footage.
This cost can't be integrated in length cost ?
Antony
Posted on November 9, 2022
Hey Boris, glad you answered me.
Thanks for the information, I thought there was no way to price the accessories, I was trying to edit the value directly in the materials tab.
Regarding the other functions, I don't know if I'm doing something wrong, but my difficulty follows.
=============
See, in the photo I took a small piece of 636mm x 475mm. Then I placed the tape on its edge on all sides, totaling 2,221 meters.
Thanks for the information, I thought there was no way to price the accessories, I was trying to edit the value directly in the materials tab.
Regarding the other functions, I don't know if I'm doing something wrong, but my difficulty follows.
=============
See, in the photo I took a small piece of 636mm x 475mm. Then I placed the tape on its edge on all sides, totaling 2,221 meters.
Boris Beaulant
Posted on November 10, 2022
Hi,
Price defined in the field with no dimension in the material attributes is used only for leftovers defined in cutting diagram configuration or if the used band size price is not defined.
You can't use it for "glue process" cost.
Price defined in the field with no dimension in the material attributes is used only for leftovers defined in cutting diagram configuration or if the used band size price is not defined.
You can't use it for "glue process" cost.
Francisco carrillo
Posted on November 30, 2022
Hola,
Yo tengo un problema parecido, compro el material en un almacén que me cotan el tablero gratuitamente al comprarles el material a ellos, también le pegan el canto, pero este tiene un coste de 1.45€ el metro, si pongo este costo con un royo de 75 metros el precio que me da es el del royo, aunque el canto usado sea 3 metros, es posible que no cuente el largo del royo sino los metros necesarios para hacer el trabajo multiplicado por el coste del metro lineal? asi el resultado seria 1.45*3=4.35 € en lugar de 108.75 € que da debido a que multiplica 1.45*75
Yo tengo un problema parecido, compro el material en un almacén que me cotan el tablero gratuitamente al comprarles el material a ellos, también le pegan el canto, pero este tiene un coste de 1.45€ el metro, si pongo este costo con un royo de 75 metros el precio que me da es el del royo, aunque el canto usado sea 3 metros, es posible que no cuente el largo del royo sino los metros necesarios para hacer el trabajo multiplicado por el coste del metro lineal? asi el resultado seria 1.45*3=4.35 € en lugar de 108.75 € que da debido a que multiplica 1.45*75