Improvements

Antony

Posted on November 8, 2022

Hi, I'm following the growth of your product, getting better and better.

Here are my suggestions.
- Allocate cost per accessory.
- Allocate the operating cost per cut footage.
- Allocate operating cost per tape footage.

Some functions you can get inspiration from software like MaxCut, CorteCerto, Promob.

Your product has great capacity in Brazil, making some adjustments, you can reach from small carpenters to large industries.

Boris Beaulant

Posted on November 8, 2022

Hi Antony,

Thank you to appreciate OpenCutList !

Allocate cost per accessory.

It's already possible. Go to each accessory part properties or attribute dialog.


Allocate the operating cost per cut footage.
Yes but a generic price per length of a different price according to the material ?

Allocate operating cost per tape footage.
This cost can't be integrated in length cost ?

Antony

Posted on November 9, 2022

 Hey Boris, glad you answered me.

Thanks for the information, I thought there was no way to price the accessories, I was trying to edit the value directly in the materials tab. 

 Regarding the other functions, I don't know if I'm doing something wrong, but my difficulty follows. 
 
=============
 See, in the photo I took a small piece of 636mm x 475mm. Then I placed the tape on its edge on all sides, totaling 2,221 meters. 

=============

Here in the materials edition, assign a value of €1.50 per meter. This amount is for the cost of labor and glue.
Then I considered €0.50 per meter as the cost of the tape. 


==================

If we look at that, the report is telling me that the cost will be €25 with ribbons, considering the 50 meter roll. But he must consider 2.21 meters, and allocate €1.50 + €0.50 for that yardage.


I don't know if I was able to express myself correctly, any questions ask me.  Thanks 

Boris Beaulant

Posted on November 10, 2022

Hi,

Price defined in the field with no dimension in the material attributes is used only for leftovers defined in cutting diagram configuration or if the used band size price is not defined.
You can't use it for "glue process" cost.

Francisco carrillo

Posted on November 30, 2022

Hola,
Yo tengo un problema parecido, compro el material en un almacén que me cotan el tablero gratuitamente al comprarles el material a ellos, también le pegan el canto, pero este tiene un coste de 1.45€ el metro, si pongo este costo con un royo de 75 metros el precio que me da es el del royo, aunque el canto usado sea 3 metros, es posible que no cuente el largo del royo sino los metros necesarios para hacer el trabajo multiplicado por el coste del metro lineal? asi el resultado seria 1.45*3=4.35 € en lugar de 108.75 € que da debido a que multiplica 1.45*75